0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Built-up Wrought-Iron Compression Member with Missing Stitch Rivets

 Built-up Wrought-Iron Compression Member with Missing Stitch Rivets
Author(s): ,
Presented at IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, published in , pp. 1101-1108
DOI: 10.2749/222137814814067329
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

London Canada's Blackfriars Bridge, fabricated by the Wrought Iron Bridge Company of Canton Ohio, has been in service since 1875. The parabolic top chord of this tied-arch through-truss structure ...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Published in:
Page(s): 1101-1108 Total no. of pages: 8
Page(s): 1101-1108
Total no. of pages: 8
Year: 2014
DOI: 10.2749/222137814814067329
Abstract:

London Canada's Blackfriars Bridge, fabricated by the Wrought Iron Bridge Company of Canton Ohio, has been in service since 1875. The parabolic top chord of this tied-arch through-truss structure is built-up using seven shapes interconnected by stitch rivets. Recent inspections indicated extensive stitch rivet failures, raising concerns that the fully composite action of the member has been compromised, with ist constituent shapes in danger of separating. The bridge was temporarily closed to both vehicular and pedestrian traffic to facilitate emergency repairs. This paper investigates the loss of compressive capacity of the built-up compression chord due to missing stitch rivets, including preliminary calculation of the effect of the missing rivets in accordance with the provisions of Canadian steel design standards for built-up members.

Keywords:
wrought-iron built-up compression members