0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

BIM Practical Application - New bugesera international airport (Rwanda)

 BIM Practical Application - New bugesera international airport (Rwanda)
Author(s): , , ,
Presented at IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, published in , pp. 290-296
DOI: 10.2749/guimaraes.2019.0290
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.55 MB

The increasing complexity of buildings is expressed through different aspects. Requirements such as complex architectural shapes and highly demanding environmental performance require better and mo...
Read more

Bibliographic Details

Author(s): (GEG, Porto, Portugal)
(GEG, Porto, Portugal)
(GEG, Porto, Portugal)
(GEG, Porto, Portugal)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Published in:
Page(s): 290-296 Total no. of pages: 7
Page(s): 290-296
Total no. of pages: 7
DOI: 10.2749/guimaraes.2019.0290
Abstract:

The increasing complexity of buildings is expressed through different aspects. Requirements such as complex architectural shapes and highly demanding environmental performance require better and more sophisticated engineering solutions.

The challenging deadlines and budget control demand optimized and automated solutions that adapt perfectly to each project and to the evolution between design stages. These and other aspects generate a proliferation of information and make the life cycle of the project progressively more complex and difficult to control. In this scenario it is imperative for the design team to make use of the most advanced tools available and adapt the design processes to exceed current expectations and prepare future market demands.

GEG has already fully embraced the BIM methodology, in order to respond to these challenges on the projects it is involved.

This article intends to present a specific project - the New Bugesera International Airport of Kigali in Rwanda - as an example of implementation of these processes. Through this example such aspects as the strategies, the difficulties, the advantages, and the tools used to overcome the different challenges are presented. The possibility of showing on site construction, as this is a fast track design build project that is already under construction, introduces additional difficulties but also increases the interest to present this case.

Keywords:
airports BIM automation interoperability Parametric