0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Assessment of steel railway bridges for future traffic demands a case study

 Assessment of steel railway bridges for future traffic demands a case study
Author(s): , , ,
Presented at IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, published in , pp. 454-455
DOI: 10.2749/weimar.2007.0757
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.74 MB

The purpose of this study is to identify the factors affecting the remaining effective service life of a steel railway bridge that has been giving service for the last 50 years and that will be imp...
Read more

Bibliographic Details

Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Published in:
Page(s): 454-455 Total no. of pages: 7
Page(s): 454-455
Total no. of pages: 7
Year: 2007
DOI: 10.2749/weimar.2007.0757
Abstract:

The purpose of this study is to identify the factors affecting the remaining effective service life of a steel railway bridge that has been giving service for the last 50 years and that will be implemented as part of Marmaray project, a project that aims not only to connect two continents, Europe and Asia, by providing an underwater link for the first time, but also upgrading of existing commuter rail system thoroughly. Detailed field measurements and in-depth analytical studies were conducted on the bridge and by using the computer model which was refined by field measurements, the bridge was re-assessed according to expected train traffic in the future. The results were used to determine the remaining life of the bridge. In order to improve the fatigue life, a strengthening scheme to extend the service life was proposed for a typical bridge component.

Keywords:
fatigue railroad bridge rail bridge field testing remaining fatigue life bridge assessment