The assembly and replacement of the Weesperbridge
|
Bibliographic Details
Author(s): |
Anne Blom
(Projectleader Movares Utrecht, The Netherlands)
Arjen Steenbrink (Structural engineer, Movares, Utrecht, The Netherlands) Bert Hesselink (Consulting Engineer, Movares, Utrecht, The Netherlands) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015 | ||||
Published in: | IABSE Conference Geneva 2015 | ||||
|
|||||
Page(s): | 402-407 | ||||
Total no. of pages: | 6 | ||||
Year: | 2015 | ||||
DOI: | 10.2749/222137815818357449 | ||||
Abstract: |
In The Netherlands the long closing of main roads and major waterways are unacceptable due to economic reasons. So swapping of the old Weesperbridge for the new one, must be completed within eight hours. Also de transportation is a problem of the new bridge in a densely populated country as The Netherlands. This is challenge that the design engineers have to deal with while searching for a method to swap the two bridges in a short period of time. To realize the transport the new bridge must be transported in two sections. The first section is the arch and the second is the bridge deck. The engineers must make sure that the structures remain stable during all steps of the construction. For the installation within one night, the strength and stability must be checked in all steps of construction. This results in the following measures:
|
||||
Keywords: |
steel heavy lifting stability Temporary Structures transportation and installation
|