Arco de tablero intermedio sobre el barranco de Erques. Construcción

Through arch bridge over Erques Ravine. Construction

Author(s):



Medium: conference paper
Language(s): Spanish
Conference: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017
Year: 2017
Abstract: A heavy crane with a maximum capacity of 600 tones was used to install both arches. Each of them had a weight of 110 tones and was installed approximately 60 meters far from the abutment. The steel grillage was installed same way. For that purpose the grillage had to be split into four segments that were hung from the corresponding hangers by means of the mentioned crane. For these processes a group of auxiliary systems was designed, giving the structure an appropriate adjustment capacity, both in geometry and loads, with the idea of developing the installation in an efficient and safe way.
Keywords:
regulation crane arch

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10299475
  • Published on:
    10/02/2019
  • Last updated on:
    05/03/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine