Analysis on Segmental Deck Replacement Plan for Large-Span Network Arch Bridge

 Analysis on Segmental Deck Replacement Plan for Large-Span Network Arch Bridge
Author(s): , , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 1756-1764
DOI: 10.2749/nanjing.2022.1756
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

As a long-span network suspender arch bridge, the main girder of Qilu Yellow River Bridge was designed as steel-concrete composite structure, and the concrete deck was designed as replaceable compo...
Read more

Bibliographic Details

Author(s): (Tongji University, Shanghai, China)
(Tongji University, Shanghai, China)
(CCCC Quanzhou Expressway Co., Ltd., Quanzhou, China)
(CCCC Quanzhou Expressway Co., Ltd., Quanzhou, China)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 1756-1764 Total no. of pages: 9
Page(s): 1756-1764
Total no. of pages: 9
DOI: 10.2749/nanjing.2022.1756
Abstract:

As a long-span network suspender arch bridge, the main girder of Qilu Yellow River Bridge was designed as steel-concrete composite structure, and the concrete deck was designed as replaceable components due to the possible severe local damage caused by the direct vehicle load. In this paper, different segmental replacement plans were put forward according to the structural characteristics, and an integral mixed finite element (FE) model was established based on the 420m main span in order to study the mechanical performance of this bridge in the process of deck replacement. The effect of variable replacement lengths and positions on the structural response, in both longitudinal and transverse directions was figured out. The analysis results show that all the deck replacement plans discussed in this paper are feasible, and different demolition methods affect the stress change amplitude of the structure in different way, of which the lateral change of replacement methods has a more obvious impact on the structure.

Keywords:
FE steel-concrete composite beam large-span network arch bridge segmental deck replacement
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Structures and Projects