0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

83.92 m Wide Rail Over Bridge – Chipiyana, Gautam Buddha Nagar, UP, India

 83.92 m Wide Rail Over Bridge – Chipiyana, Gautam Buddha Nagar, UP, India
Author(s):
Presented at IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, published in , pp. 1039-1047
DOI: 10.2749/newdelhi.2023.1039
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 1.12 MB

The paper deals with the planning, design & construction of the widest Rail Over Bridge (ROB) at Railway km. 1429/6-8 between Ghaziabad & Maripat Railway Station on NH-24 at km. 20+213 at C...
Read more

Bibliographic Details

Author(s): (B & S Engineering Consultants Pvt. Ltd., Noida, INDIA)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Published in:
Page(s): 1039-1047 Total no. of pages: 9
Page(s): 1039-1047
Total no. of pages: 9
DOI: 10.2749/newdelhi.2023.1039
Abstract:

The paper deals with the planning, design & construction of the widest Rail Over Bridge (ROB) at Railway km. 1429/6-8 between Ghaziabad & Maripat Railway Station on NH-24 at km. 20+213 at Chipiyana, Gautam Buddha Nagar, Uttar Pradesh, India. This ROB is a part of package-II of India’s widest, 96 km long, access-controlled Delhi-Meerut Expressway (DME). There is an existing ROB of width 23 m & 60o skew to the main expressway alignment. To provide additional lanes of expressway, new bridges are constructed on the left and right sides of existing ROB. Existing ROB will serve as the carriageway for DME leading to sustainability by utilizing the existing resources. The ROB comprises four new carriageways with three long spans consisting of 115 m steel truss, 74,410 m (61,574o skew) & 66,375 m (58,352o skew) SCC superstructures. This ROB has achieved various milestones such as Launching of 76 m long steel girder assembly, the fabrication & launching of 115 m long steel truss and the construction of 50 m wide portal frame type substructures in an exceptionally high skew angle of around 60o.

Keywords:
sustainability construction planning HSFG bolts design & DME ROB Existing Railway Tracks Steel Truss (Pratt-type) Steel Concrete Composite (SCC) Profile Sheet