5/6 Arches: a Megastructure becoming a land marking Monument
|
Bibliographic Details
Author(s): |
Silvia Geyer
(Redaelli Tecna, Milan, Italy)
Claudio Pin (Redaelli Tecna, Milan, Italy) Daniela Lombardini (Redaelli Tecna, Milan, Italy) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018 | ||||
Published in: | IABSE Symposium Nantes 2018 | ||||
|
|||||
Page(s): | S28-73 | ||||
Total no. of pages: | 7 | ||||
DOI: | 10.2749/nantes.2018.s28-73 | ||||
Abstract: |
5/6 Arches is an iconic project serving as gateway to Doha’s West Bay Business District. The two arches are made of 10.000 tons of steel, with a structural cable net that comprises 90 tons of Full Locked Coil (FLC) cables and their sockets. Designed by AECOM and realized by HYUNDAI CONSTRUCTION and EVERSENDAI, it represents the heaviest steel monument in the world. Redaelli’s contribution to this land marking structure includes cables and clamps supply, engineering of cable net installation and tensioning and all related site activities. The net is composed by diagonal and valley cables, connected by 473 crossing clamps for a total mass of 80 tons. Clamps are specially designed with a modular scheme to accommodate for several angles at cable intersections. |
||||
Keywords: |
installation spatial structures Conceptual Design and Realization FLC Cables Clamps tensioning
|