Zayed, Tarek M. / Chang, Luh-Maan (2002): Prototype Model for Build-Operate-Transfer Risk Assessment. In: Journal of Management in Engineering (ASCE), v. 18, n. 1 (January 2002).
https://doi.org/10.1061/(asce)0742-597x(2002)18:1(7)
-
Zayed, Tarek M. / Halpin, Daniel (2001): Simulation of Concrete Batch Plant Production. In: Journal of Construction Engineering and Management, v. 127, n. 2 (April 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:2(132)
-
Zayed, Tarek M. (2005): Productivity and Cost Assessment for Continuous Flight Auger Piles. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(677)
-
Zayed, Tarek M. / Halpin, Daniel W. (2005): Pile Construction Productivity Assessment. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(705)
-
Zayed, Tarek M. / Minkarah, Issam (2004): Resource Allocation for Concrete Batch Plant Operation: Case Study. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(560)
-
Zayed, Tarek M. / Halpin, Daniel W. (2004): Process versus Data Oriented Techniques in Pile Construction Productivity Assessment. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(490)
-
Zhang, Cheng / Hammad, Amin / Zayed, Tarek M. / Wainer, Gabriel / Pang, Hong (2007): Cell-based representation and analysis of spatial resources in construction simulation. In: Automation in Construction, v. 16, n. 4 (July 2007).
https://doi.org/10.1016/j.autcon.2006.07.009
-
Zayed, Tarek M. / Halpin, Daniel W. (2005): Productivity and Cost Regression Models for Pile Construction. In: Journal of Construction Engineering and Management, v. 131, n. 7 (July 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:7(779)
-
Ammar, Mohammad A. / Moselhi, Osama / Zayed, Tarek M. (2012): Decision support model for selection of rehabilitation methods of water mains. In: Structure and Infrastructure Engineering, v. 8, n. 9 (September 2012).
https://doi.org/10.1080/15732479.2010.497539
-
Zayed, Tarek M. / Halpin, Daniel W. (2005): Deterministic models for assessing productivity and cost of bored piles. In: Construction Management and Economics, v. 23, n. 5 (June 2005).
https://doi.org/10.1080/01446190500039911
-
Zayed, Tarek M. / Halpin, Daniel W. / Basha, Ismail M. (2005): Productivity and delays assessment for concrete batch plant‐truck mixer operations. In: Construction Management and Economics, v. 23, n. 8 (October 2005).
https://doi.org/10.1080/01446190500184451
-
Zayed, Tarek M. / Nosair, Ibrahim A. (2006): Cost management for concrete batch plant using stochastic mathematical models. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 8 (August 2006).
https://doi.org/10.1139/l06-051
-
Zayed, Tarek M. (2004): Budget Allocation for Steel Bridge Paint Maintenance. In: Journal of Performance of Constructed Facilities (ASCE), v. 18, n. 1 (February 2004).
https://doi.org/10.1061/(asce)0887-3828(2004)18:1(36)
-
Zayed, Tarek M. / Chang, Luh-Maan / Fricker, Jon D. (2002): Life-Cycle Cost Based Maintenance Plan for Steel Bridge Protection Systems. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002).
https://doi.org/10.1061/(asce)0887-3828(2002)16:2(55)
-
Zayed, Tarek M. / Chang, Luh-Maan / Fricker, Jon D. (2002): Statewide Performance Function for Steel Bridge Protection Systems. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002).
https://doi.org/10.1061/(asce)0887-3828(2002)16:2(46)
-
Zayed, Tarek M. / Chang, Luh-Maan / Fricker, Jon D. (2002): Life-Cycle Cost Analysis using Deterministic and Stochastic Methods: Conflicting Results. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002).
https://doi.org/10.1061/(asce)0887-3828(2002)16:2(63)
-
Zayed, Tarek M. / Halpin, Daniel W. (2004): Quantitative Assessment for Piles Productivity Factors. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:3(405)
-
Zayed, Tarek M. / Halpin, Daniel W. (2004): Simulation as a Tool for Pile Productivity Assessment. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:3(394)