0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Tarek M. Zayed

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zayed, Tarek M. / Chang, Luh-Maan (2002): Prototype Model for Build-Operate-Transfer Risk Assessment. In: Journal of Management in Engineering (ASCE), v. 18, n. 1 (January 2002).

    https://doi.org/10.1061/(asce)0742-597x(2002)18:1(7)

  2. Zayed, Tarek M. / Halpin, Daniel (2001): Simulation of Concrete Batch Plant Production. In: Journal of Construction Engineering and Management, v. 127, n. 2 (April 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:2(132)

  3. Zayed, Tarek M. (2005): Productivity and Cost Assessment for Continuous Flight Auger Piles. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:6(677)

  4. Zayed, Tarek M. / Halpin, Daniel W. (2005): Pile Construction Productivity Assessment. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:6(705)

  5. Zayed, Tarek M. / Minkarah, Issam (2004): Resource Allocation for Concrete Batch Plant Operation: Case Study. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(560)

  6. Zayed, Tarek M. / Halpin, Daniel W. (2004): Process versus Data Oriented Techniques in Pile Construction Productivity Assessment. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(490)

  7. Zhang, Cheng / Hammad, Amin / Zayed, Tarek M. / Wainer, Gabriel / Pang, Hong (2007): Cell-based representation and analysis of spatial resources in construction simulation. In: Automation in Construction, v. 16, n. 4 (July 2007).

    https://doi.org/10.1016/j.autcon.2006.07.009

  8. Zayed, Tarek M. / Halpin, Daniel W. (2005): Productivity and Cost Regression Models for Pile Construction. In: Journal of Construction Engineering and Management, v. 131, n. 7 (July 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:7(779)

  9. Ammar, Mohammad A. / Moselhi, Osama / Zayed, Tarek M. (2012): Decision support model for selection of rehabilitation methods of water mains. In: Structure and Infrastructure Engineering, v. 8, n. 9 (September 2012).

    https://doi.org/10.1080/15732479.2010.497539

  10. Zayed, Tarek M. / Halpin, Daniel W. (2005): Deterministic models for assessing productivity and cost of bored piles. In: Construction Management and Economics, v. 23, n. 5 (June 2005).

    https://doi.org/10.1080/01446190500039911

  11. Zayed, Tarek M. / Halpin, Daniel W. / Basha, Ismail M. (2005): Productivity and delays assessment for concrete batch plant‐truck mixer operations. In: Construction Management and Economics, v. 23, n. 8 (October 2005).

    https://doi.org/10.1080/01446190500184451

  12. Zayed, Tarek M. / Nosair, Ibrahim A. (2006): Cost management for concrete batch plant using stochastic mathematical models. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 8 (August 2006).

    https://doi.org/10.1139/l06-051

  13. Zayed, Tarek M. (2004): Budget Allocation for Steel Bridge Paint Maintenance. In: Journal of Performance of Constructed Facilities (ASCE), v. 18, n. 1 (February 2004).

    https://doi.org/10.1061/(asce)0887-3828(2004)18:1(36)

  14. Zayed, Tarek M. / Chang, Luh-Maan / Fricker, Jon D. (2002): Life-Cycle Cost Based Maintenance Plan for Steel Bridge Protection Systems. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002).

    https://doi.org/10.1061/(asce)0887-3828(2002)16:2(55)

  15. Zayed, Tarek M. / Chang, Luh-Maan / Fricker, Jon D. (2002): Statewide Performance Function for Steel Bridge Protection Systems. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002).

    https://doi.org/10.1061/(asce)0887-3828(2002)16:2(46)

  16. Zayed, Tarek M. / Chang, Luh-Maan / Fricker, Jon D. (2002): Life-Cycle Cost Analysis using Deterministic and Stochastic Methods: Conflicting Results. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002).

    https://doi.org/10.1061/(asce)0887-3828(2002)16:2(63)

  17. Zayed, Tarek M. / Halpin, Daniel W. (2004): Quantitative Assessment for Piles Productivity Factors. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(405)

  18. Zayed, Tarek M. / Halpin, Daniel W. (2004): Simulation as a Tool for Pile Productivity Assessment. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(394)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine