Adel R. Zaki
- Reliability-based condition assessment of a deteriorated concrete bridge. In: Structural Monitoring and Maintenance, v. 1, n. 4 (December 2014). (2014):
- Precast concrete integrated deck system for highway and railway bridges. Presented at: IABSE Colloquium: Concrete Model Code for Asia - Structurae Concrete: Design, Materials and Construction, and Maintenance, Phuket, Thailand, 17-18 March 1999. (1999):
- The Reconstruction of L'Acadie Elevated Roundabout. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004. (2004):
- The Saguenay River Suspended Bridge. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004. (2004):
- Deck Reconstruction of Jacques Cartier Bridge Using Precast Prestressed High Performance Concrete Panels. In: PCI Journal, v. 48, n. 5 (September 2003). (2003):
- Du Chene River Railway Bridge. In: PCI Journal, v. 34, n. 5 (September 1989). (1989):