Toshihiro Yoshimura
- 2×4 Cables System for Aerodynamic Stability of Long Suspension Bridge. Presented at: IABSE Symposium: Responding to Tomorrow's Challenges in Structural Engineering, Budapest, Hungary, 13-15 September 2006. (2006):
- (2010): Aerodynamic Stability of Large Suspension Bridge using Cable Frames. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.
- New system for aerodynamic stability of suspension bridge. Presented at: IABSE Symposium: Long-Span and High-Rise Structures, Kobe, Japan, September 1998. (1998):