C. Y. Yiu
- Failure probability of external wall tiling systems. An empirical study of weathering impacts. In: Structural Survey, v. 24, n. 5 (October 2006). (2006):
- The causes of external wall tiling defects in Hong Kong. In: Structural Survey, v. 23, n. 5 (December 2005). (2005):
- A cost‐and‐benefit evaluation of housing rehabilitation. In: Structural Survey, v. 23, n. 2 (April 2005). (2005):
- Institutional arrangement and unauthorised building works in Hong Kong. In: Structural Survey, v. 23, n. 1 (February 2005). (2005):
- Contractor selection for small building works in Hong Kong. In: Structural Survey, v. 20, n. 4 (October 2002). (2002):
- Weathering effects on external wall tiling systems. In: Construction and Building Materials, v. 21, n. 3 (March 2007). (2007):
- Performance Evaluation for Cost Estimators by Reliability Interval Method. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005). (2005):
- Rational under‐pricing in bidding strategy: a real options model. In: Construction Management and Economics, v. 24, n. 5 (May 2006). (2006):
- A longitudinal analysis on the relationship between construction output and GDP in Hong Kong. In: Construction Management and Economics, v. 22, n. 4 (May 2004). (2004):