Li Ying
- A data-driven model for damage evolution of bridge stay cable. In: Case Studies in Construction Materials, v. 20 (July 2024). (2024):
- Corrosion protection failure test analysis of the initial damaged cable ICCP mechanism. In: Case Studies in Construction Materials, v. 20 (July 2024). (2024):
- Hong Kong Zhuhai Macao Bridge-Tunnel project immersed tunnel and artificial islands – From an Owners’ perspective. In: Tunnelling and Underground Space Technology, v. 121 (March 2022). (2022):