Ziwei Yin
- Multi-objective optimization control for shield cutter wear and cutting performance using LightGBM and enhanced NSGA-II. In: Automation in Construction, v. 171 (March 2025). (2025):
- A BIM-based multi-model framework for advancing TBM performance − part 1: Real-time prediction of thrust force. In: Tunnelling and Underground Space Technology, v. 151 (September 2024). (2024):