Tong Yin
- (2018): A Coupled CFD–DEM Simulation of Slurry Infiltration and Filter Cake Formation during Slurry Shield Tunneling. In: Infrastructures, v. 3, n. 2 (June 2018).
- On the morphology and pressure-filtration characteristics of filter cake formation: Insight from coupled CFD–DEM simulations. In: Tunnelling and Underground Space Technology, v. 111 (May 2021). (2021):
- Slurry filtration process and filter cake formation during shield tunnelling: Insight from coupled CFD-DEM simulations of slurry filtration column test. In: Tunnelling and Underground Space Technology, v. 87 (May 2019). (2019):