0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zhao, Yu / Wang, Tingwei / Yi, Wen (2023): Emergy-accounting-based comparison of carbon emissions of solid waste recycled concrete. In: Construction and Building Materials, v. 387 (July 2023).

    https://doi.org/10.1016/j.conbuildmat.2023.131674

  2. Tan, Yi / Yi, Wen / Chen, Penglu / Zou, Yang (2024): An adaptive crack inspection method for building surface based on BIM, UAV and edge computing. In: Automation in Construction, v. 157 (January 2024).

    https://doi.org/10.1016/j.autcon.2023.105161

  3. Yi, Wen / Wang, Huiwen / Zhen, Lu / Liu, Yannick (2023): Automated Generation of Horizontal Precast Slab Stacking Plans. In: Journal of Construction Engineering and Management, v. 149, n. 12 (December 2023).

    https://doi.org/10.1061/jcemd4.coeng-13424

  4. Wang, Huiwen / Yi, Wen / Tian, Xuecheng / Zhen, Lu (2023): Prescriptive Analytics for Intelligent Transportation Systems with Uncertain Demand. In: Journal of Transportation Engineering, Part A: Systems, v. 149, n. 12 (December 2023).

    https://doi.org/10.1061/jtepbs.teeng-8068

  5. Chen, Xinyuan / Yi, Wen / Yuan, Hongping / Wu, Weiwei (2023): Construction and demolition waste disposal charging scheme design. In: Computer-Aided Civil and Infrastructure Engineering, v. 39, n. 2 (August 2023).

    https://doi.org/10.1111/mice.13066

  6. Eliwa, Hassan Khames / Jelodar, Mostafa Babaeian / Poshdar, Mani / Yi, Wen (2023): Information and Communication Technology Applications in Construction Organizations: a Scientometric Review. In: Journal of Information Technology in Construction, v. 28 (February 2023).

    https://doi.org/10.36680/j.itcon.2023.014

  7. Yao, Jiaxu / Yi, Wen / Wang, Haoqing / Zhen, Lu / Liu, Yannick (2022): Stackelberg game model for construction waste disposal network design. In: Automation in Construction, v. 144 (December 2022).

    https://doi.org/10.1016/j.autcon.2022.104573

  8. Zeng, Ziling / Yi, Wen / Wang, Shuaian / Qu, Xiaobo (2021): Emergency Vehicle Routing in Urban Road Networks with Multistakeholder Cooperation. In: Journal of Transportation Engineering, Part A: Systems, v. 147, n. 10 (October 2021).

    https://doi.org/10.1061/jtepbs.0000577

  9. Sui, ZiFan / Yi, Wen / Lu, YunGang / Deng, Liang (2021): Experimental and Numerical Simulation Study on the Shear Strength Characteristics of Magnolia multiflora Root-Soil Composites. In: Advances in Civil Engineering, v. 2021 (January 2021).

    https://doi.org/10.1155/2021/6642594

  10. Yi, Wen / Sutrisna, Monty (2021): Drone scheduling for construction site surveillance. In: Computer-Aided Civil and Infrastructure Engineering, v. 36, n. 1 (19 December 2021).

    https://doi.org/10.1111/mice.12593

  11. Yi, Wen / Wang, Shuaian (2017): Mixed-Integer Linear Programming on Work-Rest Schedule Design for Construction Sites in Hot Weather. In: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 5 (April 2017).

    https://doi.org/10.1111/mice.12267

  12. Yi, Wen / Wang, Shuaian (2016): Multi-Objective Mathematical Programming Approach to Construction Laborer Assignment with Equity Consideration. In: Computer-Aided Civil and Infrastructure Engineering, v. 31, n. 12 (November 2016).

    https://doi.org/10.1111/mice.12239

  13. Yi, Wen / Zhao, Yijie / Chan, Albert P. C. / Lam, Edmond W. M. (2017): Optimal cooling intervention for construction workers in a hot and humid environment. In: Building and Environment, v. 118 (June 2017).

    https://doi.org/10.1016/j.buildenv.2017.03.032

  14. Yi, Wen / Chan, Albert P. C. (2013): Optimizing work–rest schedule for construction rebar workers in hot and humid environment. In: Building and Environment, v. 61 (March 2013).

    https://doi.org/10.1016/j.buildenv.2012.12.012

  15. Chan, Albert P. C. / Yi, Wen / Wong, Del P. / Yam, Michael C. H. / Chan, Daniel W. M. (2012): Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment. In: Building and Environment, v. 58 (December 2012).

    https://doi.org/10.1016/j.buildenv.2012.07.006

  16. Chan, Albert P. C. / Wong, Francis K. W. / Wong, Del P. / Lam, Edmond W. M. / Yi, Wen (2012): Determining an optimal recovery time after exercising to exhaustion in a controlled climatic environment: Application to construction works. In: Building and Environment, v. 56 (October 2012).

    https://doi.org/10.1016/j.buildenv.2012.02.013

  17. Yi, Wen / Wang, Shuaian / Zhang, Abraham (2020): Optimal transportation planning for prefabricated products in construction. In: Computer-Aided Civil and Infrastructure Engineering, v. 35, n. 4 (4 March 2020).

    https://doi.org/10.1111/mice.12504

  18. Yi, Wen / Chan, Albert P. C. (2015): Which Environmental Indicator Is Better Able to Predict the Effects of Heat Stress on Construction Workers?. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000284

  19. Yi, Wen / Chan, Albert P. C. (2014): Alternative Approach for Conducting Construction Management Research: Quasi-Experimentation. In: Journal of Management in Engineering (ASCE), v. 30, n. 6 (November 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000276

  20. Yi, Wen / Chan, Albert P. C. (2014): Critical Review of Labor Productivity Research in Construction Journals. In: Journal of Management in Engineering (ASCE), v. 30, n. 2 (March 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000194

  21. Chan, Albert P. C. / Yi, Wen / Chan, Daniel W. M. / Wong, Del P. (2013): Using the Thermal Work Limit as an Environmental Determinant of Heat Stress for Construction Workers. In: Journal of Management in Engineering (ASCE), v. 29, n. 4 (October 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000162

  22. Yi, Wen / Chan, Albert P. C. (2015): Optimal Work Pattern for Construction Workers in Hot Weather: A Case Study in Hong Kong. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000419

  23. Chen, Dar Hao / Zhou, Wujun / Yi, Wen / Won, Moon (2014): Full-depth concrete pavement repair with steel reinforcements. In: Construction and Building Materials, v. 51 (January 2014).

    https://doi.org/10.1016/j.conbuildmat.2013.10.086

  24. Liu, Xin / Song, Yongze / Yi, Wen / Wang, Xiangyu / Zhu, Junxiang (2018): Comparing the Random Forest with the Generalized Additive Model to Evaluate the Impacts of Outdoor Ambient Environmental Factors on Scaffolding Construction Productivity. In: Journal of Construction Engineering and Management, v. 144, n. 6 (June 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001495

  25. Li, Xiao / Yi, Wen / Chi, Hung-Lin / Wang, Xiangyu / Chan, Albert P. C. (2018): A critical review of virtual and augmented reality (VR/AR) applications in construction safety. In: Automation in Construction, v. 86 (February 2018).

    https://doi.org/10.1016/j.autcon.2017.11.003

  26. Yi, Wen / Chan, Albert P. C. / Wang, Xiangyu / Wang, Jun (2016): Development of an early-warning system for site work in hot and humid environments: A case study. In: Automation in Construction, v. 62 (February 2016).

    https://doi.org/10.1016/j.autcon.2015.11.003

  27. Yi, Wen / Chi, Hung-Lin / Wang, Shuaian (2018): Mathematical programming models for construction site layout problems. In: Automation in Construction, v. 85 (January 2018).

    https://doi.org/10.1016/j.autcon.2017.10.031

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine