Junichi Yagi
- Action-based union of the temporal opposites in scheduling: non-deterministic approach. In: Automation in Construction, v. 12, n. 3 (May 2003). (2003):
- Development of virtual and real-field construction management systems in innovative, intelligent field factory. In: Automation in Construction, v. 9, n. 5-6 (September 2000). (2000):
- Action-based union of the temporal opposites and elastic activity network in scheduling. In: Automation in Construction, v. 15, n. 5 (September 2006). (2006):
- Parts and packets unification radio frequency identification (RFID) application for construction. In: Automation in Construction, v. 14, n. 4 (August 2005). (2005):