Ping Xie
- Multi-objective optimization control for shield cutter wear and cutting performance using LightGBM and enhanced NSGA-II. In: Automation in Construction, v. 171 (March 2025). (2025):
- Multi-LoD BIM integrated design framework for pressurised tunnel: Hydro-mechanical coupling simulation and sustainability assessment. In: Tunnelling and Underground Space Technology, v. 158 (April 2025). (2025):
- A BIM-based multi-model framework for advancing TBM performance − part 1: Real-time prediction of thrust force. In: Tunnelling and Underground Space Technology, v. 151 (September 2024). (2024):
- Parametric geological model update and probabilistic analysis of shield tunnel excavation: A borehole-based conditional random fields approach. In: Computers and Geotechnics, v. 157 (May 2023). (2023):
- Random Field-based Tunneling Information Modeling Framework for Probabilistic Safety Assessment of Shield Tunnels. In: Journal of Civil Engineering and Management, v. 29, n. 8 (24 October 2023). (2023):
- Dynamic parametric modeling of shield tunnel: A WebGL-based framework for assisting shield segment assembly point selection. In: Tunnelling and Underground Space Technology, v. 142 (December 2023). (2023):
- Automatic Safety Evaluation and Visualization of Subway Station Excavation Based on Bim-fem/fdm Integrated Technology. In: Journal of Civil Engineering and Management, v. 28, n. 4 (8 March 2022). (2022):
- Probabilistic analysis of subway station excavation based on BIM-RF integrated technology. In: Automation in Construction, v. 135 (March 2022). (2022):