Lin Xia
- A three-stage decision-making process for cost-effective passive solutions in office buildings in the hot summer and cold winter zone in China. In: Energy and Buildings, v. 268 (August 2022). (2022):
- Eco-friendly fiberboard production without binder using poplar wood shavings bio-pretreated by white rot fungi Coriolus versicolor. In: Construction and Building Materials, v. 236 (March 2020). (2020):
- (2013): Partially in situ protection of a historic building and a design case combined. Presented at: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.