Edward P. Wasserman
- Jointless Bridge Decks. In: Engineering Journal, v. 24, n. 3 (September 1987). (1987):
- Rehabilitation of TDOT'S SR56 Deck Truss Bridge Crossing Center Hill Lake. Presented at: Structures Congress 2013, Pittsburgh, Pennsylvania, May 2-4, 2013. :
- Lateral Load Tests on Prestressed Concrete Piles Supporting Integral Abutments. In: PCI Journal, v. 49, n. 5 (September 2004). (2004):
- Tennessee State Route 50 Bridge Over Happy Hollow Creek. In: PCI Journal, v. 44, n. 5 (September 1999). (1999):
- Case Study of a High-Performance Concrete Bridge in Tennessee. In: Practice Periodical on Structural Design and Construction, v. 11, n. 4 (November 2006). (2006):
- Optimization of HPS 70W Applications. In: Journal of Bridge Engineering (ASCE), v. 7, n. 1 (January 2002). (2002):
- Simplified Method of Lateral Distribution of Live Load Moment. In: Journal of Bridge Engineering (ASCE), v. 9, n. 4 (July 2004). (2004):
- Simplified Method for Calculating Lateral Distribution Factors for Live Load Shear. In: Journal of Bridge Engineering (ASCE), v. 10, n. 5 (September 2005). (2005):