0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Abraham Warszawski

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Warszawski, Abraham (1996): Strategic Planning in Construction Companies. In: Journal of Construction Engineering and Management, v. 122, n. 2 (June 1996).

    https://doi.org/10.1061/(ASCE)0733-9364(1996)122:2(133)

  2. Retik, Arkady / Warszawski, Abraham (1994): Automated design of prefabricated building. In: Building and Environment, v. 29, n. 4 (October 1994).

    https://doi.org/10.1016/0360-1323(94)90002-7

  3. Warszawski, Abraham / Peretz, Abraham (1992): Organization and construction of ancient projects—the case of the temple mount compound. In: Building and Environment, v. 27, n. 4 (October 1992).

    https://doi.org/10.1016/0360-1323(92)90039-r

  4. Warszawski, Abraham (1975): Analysis of Cement consumption in a national economy. In: Building Science, v. 10, n. 1 (March 1975).

    https://doi.org/10.1016/0007-3628(75)90003-1

  5. Warszawski, Abraham (1972): Planning of location and capacity of industrial plants in the construction industry. In: Building Science, v. 7, n. 4 (December 1972).

    https://doi.org/10.1016/0007-3628(72)90001-1

  6. Warszawski, Abraham (1972): Layout and location problems—the quantitative approach. In: Building Science, v. 7, n. 1 (March 1972).

    https://doi.org/10.1016/0007-3628(72)90036-9

  7. Warszawski, Abraham (1979): The evaluation of design-build proposals. In: Building and Environment, v. 14, n. 4 (January 1979).

    https://doi.org/10.1016/0360-1323(79)90004-0

  8. Warszawski, Abraham / Rosenfeld, Yehiel / Shohet, Igal (1996): Autonomous Mapping System for an Interior Finishing Robot. In: Journal of Computing in Civil Engineering, v. 10, n. 1 (January 1996).

    https://doi.org/10.1061/(asce)0887-3801(1996)10:1(67)

  9. Warszawski, Abraham (1984): Construction Management Program. In: Journal of Construction Engineering and Management, v. 110, n. 3 (September 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:3(297)

  10. Warszawski, Abraham / Avraham, Moshe / Carmel, David (1984): Utilization of Precast Concrete Elements in Building. In: Journal of Construction Engineering and Management, v. 110, n. 4 (December 1984).

    https://doi.org/10.1061/(asce)0733-9364(1984)110:4(476)

  11. Warszawski, Abraham / Sangrey, Dwight A. (1985): Robotics in Building Construction. In: Journal of Construction Engineering and Management, v. 111, n. 3 (September 1985).

    https://doi.org/10.1061/(asce)0733-9364(1985)111:3(260)

  12. Roseefeld, Yehiel / Warszawski, Abraham / Laufer, Alexander (1992): Using Quality Circles to Raise Productivity and Quality of Work Life. In: Journal of Construction Engineering and Management, v. 118, n. 1 (March 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:1(17)

  13. Warszawski, Abraham / Rosenfeld, Yechiel (1994): Robot for Interior‐Finishing Works in Building: Feasibility Analysis. In: Journal of Construction Engineering and Management, v. 120, n. 1 (March 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:1(132)

  14. Shaked, Ory / Warszawski, Abraham (1995): Knowledge-Based System for Construction Planning of High-Rise Buildings. In: Journal of Construction Engineering and Management, v. 121, n. 2 (June 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:2(172)

  15. Rosenfeld, Yehiel / Warszawski, Abraham / Zajicek, Uri (1993): Full-scale building with interior finishing robot. In: Automation in Construction, v. 2, n. 3 (December 1993).

    https://doi.org/10.1016/0926-5805(93)90043-w

  16. Sacks, Rafael / Warszawski, Abraham (1997): A project model for an automated building system: design and planning phases. In: Automation in Construction, v. 7, n. 1 (December 1997).

    https://doi.org/10.1016/s0926-5805(97)00034-4

  17. Sacks, Rafael / Warszawski, Abraham / Kirsch, Uri (2000): Structural design in an automated building system. In: Automation in Construction, v. 10, n. 1 (November 2000).

    https://doi.org/10.1016/s0926-5805(00)00074-1

  18. Shohet, Igal M. / Wang, Chen / Warszawski, Abraham (2002): Automated sensor-driven mapping of reinforcement bars. In: Automation in Construction, v. 11, n. 4 (June 2002).

    https://doi.org/10.1016/s0926-5805(01)00072-3

  19. Warszawski, Abraham (2003): Analysis of Costs and Benefits of Tall Buildings. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(421)

  20. Warszawski, Abraham (1990): Expert systems for crane selection. In: Construction Management and Economics, v. 8, n. 2 (June 1990).

    https://doi.org/10.1080/01446199000000015

  21. Warszawski, Abraham / Sacks, Rafael (2004): Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(357)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine