0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Yang, Ligui / Jiang, Ruijuan / Fang, Yong / Wang, Yuyin (2024): Torsional behaviour and working mechanism of concrete-filled galvanized helical corrugated steel tubes. In: Journal of Constructional Steel Research, v. 212 (January 2024).

    https://doi.org/10.1016/j.jcsr.2023.108242

  2. Fang, Yong / Wang, Yuyin / Yang, Ligui / Yang, Hua (2023): Uniaxial Monotonic and Cyclic Compressive Stress–Strain Model for Concrete-Filled Thin-Walled Helical Corrugated Steel Tubes. In: Journal of Structural Engineering (ASCE), v. 149, n. 6 (June 2023).

    https://doi.org/10.1061/jsendh.steng-11719

  3. Geng, Yue / Wang, Yuyin / Chen, Jie / Zhao, Muzi (2020): Time-dependent behaviour of 100% recycled coarse aggregate concrete filled steel tubes subjected to high sustained load level. In: Engineering Structures, v. 210 (May 2020).

    https://doi.org/10.1016/j.engstruct.2020.110353

  4. Wang, Yuyin / Geng, Yue / Ranzi, Gianluca / Zhang, Sumei (2011): Time-dependent behaviour of expansive concrete-filled steel tubular columns. In: Journal of Constructional Steel Research, v. 67, n. 3 (March 2011).

    https://doi.org/10.1016/j.jcsr.2010.09.007

  5. Guo, Lanhui / Gao, Shan / Wang, Yuyin / Zhang, Sumei (2014): Tests of rigid composite joints subjected to bending moment combined with tension. In: Journal of Constructional Steel Research, v. 95 (April 2014).

    https://doi.org/10.1016/j.jcsr.2013.10.006

  6. Geng, Yue / Wang, Yuyin / Chen, Jie (2016): Time-dependent behaviour of steel tubular columns filled with recycled coarse aggregate concrete. In: Journal of Constructional Steel Research, v. 122 (July 2016).

    https://doi.org/10.1016/j.jcsr.2016.04.009

  7. Geng, Yue / Ranzi, Gianluca / Wang, Yuyin / Zhang, Sumei (2012): Time-dependent behaviour of concrete-filled steel tubular columns: analytical and comparative study. In: Magazine of Concrete Research, v. 64, n. 1 (January 2012).

    https://doi.org/10.1680/macr.2012.64.1.55

  8. Wang, Yuyin / Chen, Jie / Geng, Yue (2015): Testing and analysis of axially loaded normal-strength recycled aggregate concrete filled steel tubular stub columns. In: Engineering Structures, v. 86 (March 2015).

    https://doi.org/10.1016/j.engstruct.2015.01.007

  9. Geng, Yue / Wang, Yuyin / Chen, Jie (2015): Time-Dependent Behavior of Recycled Aggregate Concrete–Filled Steel Tubular Columns. In: Journal of Structural Engineering (ASCE), v. 141, n. 10 (October 2015).

    https://doi.org/10.1061/(asce)st.1943-541x.0001241

  10. Geng, Yue / Wang, Yuyin / Ranzi, Gianluca / Wu, Xinrong (2014): Time-Dependent Analysis of Long-Span, Concrete-Filled Steel Tubular Arch Bridges. In: Journal of Bridge Engineering (ASCE), v. 19, n. 4 (April 2014).

    https://doi.org/10.1061/(asce)be.1943-5592.0000549

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine