W. C. Wang
- Automating Schedule Review for Expressway Construction. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005). (2005):
- Module-Based Construction Schedule Administration for Public Infrastructure Agencies. In: Journal of Construction Engineering and Management, v. 130, n. 1 (February 2004). (2004):
- Electrically rectified piezoelectric energy harvesting induced by rotary magnetic plucking. In: Smart Materials and Structures, v. 27, n. 12 (December 2018). (2018):