Luqi Wang
- Real-time prediction of TBM penetration rates using a transformer-based ensemble deep learning model. In: Automation in Construction, v. 168 (December 2024). (2024):
- Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints. In: Buildings, v. 14, n. 10 (8 October 2024). (2024):
- Governing sustainable smart cities supported by city information modelling: a bibliometric analysis and systematic review. In: Journal of Asian Architecture and Building Engineering. :
- Analytical model for reinforcement effect and load transfer of pre-stressed anchor cable with bore deviation. In: Construction and Building Materials, v. 379 (May 2023). (2023):
- Discrete element modeling of rock-concrete bi-material discs under dynamic tensile loading. In: Construction and Building Materials, v. 327 (April 2022). (2022):
- Fire risk assessment for building operation and maintenance based on BIM technology. In: Building and Environment, v. 205 (November 2021). (2021):
- Image‐based road crack risk‐informed assessment using a convolutional neural network and an unmanned aerial vehicle. In: Structural Control and Health Monitoring, v. 28, n. 7 (2 June 2021). (2021):
- An Integrated Scientometric and SNA Approach to Explore the Classics in CEM Research. In: Journal of Civil Engineering and Management, v. 26, n. 5 (7 May 2020). (2020):