Lufeng Wang
- BIM-based intelligent optimization of complex steel joints using SVM and NSGA-II. In: Journal of Constructional Steel Research, v. 223 (December 2024). (2024):
- Automated layout generation from sites to flats using GAN and transfer learning. In: Automation in Construction, v. 166 (October 2024). (2024):
- Intelligent floor plan design of modular high-rise residential building based on graph-constrained generative adversarial networks. In: Automation in Construction, v. 159 (March 2024). (2024):
- Automated building layout generation using deep learning and graph algorithms. In: Automation in Construction, v. 154 (October 2023). (2023):
- Automated layout of modular high-rise residential buildings based on genetic algorithm. In: Automation in Construction, v. 152 (August 2023). (2023):
- Semi-automatic generation of shear wall structural models. In: Structures, v. 51 (May 2023). (2023):
- Automated structural design of shear wall structures based on modified genetic algorithm and prior knowledge. In: Automation in Construction, v. 139 (July 2022). (2022):