C. Walker
- User cost savings in eliminating pavement excavations through employing trenchless technologies. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 29, n. 5 (October 2002). (2002):
- use of modal-combination rules with cable-stayed bridges. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 163, n. 4 (December 2010). (2010):
- Procurement, design and construction of the Clyde Arc, Glasgow. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 162, n. 1 (March 2009). (2009):