- (2022): Building-as-a-Service: Theoretical Foundations and Conceptual Framework. In: Buildings, v. 12, n. 10 (20 September 2022).
- Improving the constructability of design solutions through an integrated system. In: Engineering, Construction and Architectural Management, v. 3, n. 1 (January 1996). (1996):
- Enhancing building product libraries to enable the dynamic definition of design element specifications. In: Engineering, Construction and Architectural Management, v. 7, n. 4 (April 2000). (2000):
- A vision for construction IT 2005–2010: two case studies. In: Engineering, Construction and Architectural Management, v. 9, n. 2 (February 2002). (2002):
- An XML metadata approach to seamless project information exchange between heterogeneous platforms. In: Engineering, Construction and Architectural Management, v. 10, n. 2 (April 2003). (2003):
- Assessing collaborative performance on construction projects through knowledge exchange. A UK rail strategic alliance case study. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017). (2017):
- Emerging technologies for BIM 2.0. In: Construction Innovation, v. 11, n. 3 (July 2011). (2011):
- Smart processes for smart buildings: 'sustainable processes', 'recyclable processes' and 'building seeds' in parametric design. In: Architectural Engineering and Design Management, v. 15, n. 5 (February 2019). (2019):
- Investigating the Role of Building Information Models as a Part of an Integrated Data Layer: A Fire Response Management Case. In: Architectural Engineering and Design Management, v. 3, n. 2 (January 2007). (2007):
- ProCure—a review of construction-related information technology. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 150, n. 6 (November 2002). (2002):
- Data and Process Models for the Integration of Estimating and Valuation. In: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 5 (September 1997). (1997):
- Forecasting building element maintenance within an integrated construction environment. In: Automation in Construction, v. 9, n. 2 (March 2000). (2000):
- Two design patterns for facilitating Building Information Model-based synchronous collaboration. In: Automation in Construction, v. 19, n. 5 (August 2010). (2010):
- Generating Project Estimates And Monthly Interim Valuation Certificates Within An Integrated Construction Environment. In: Civil Engineering and Environmental Systems, v. 15, n. 4 (March 1999). (1999):