J. Uma Maheswari
- BDM–MDM integrated solution concept for scheduling information-driven projects. In: Engineering, Construction and Architectural Management, v. 29, n. 2 (May 2021). (2021):
- Alternate beeline diagramming method network analysis for interdependent design entities. In: Engineering, Construction and Architectural Management, v. 26, n. 1 (February 2019). (2019):
- Axiomatic design framework for changeability in design for construction projects. In: Asian Journal of Civil Engineering, v. 21, n. 2 (October 2019). (2019):
- Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects. In: Journal of Construction Engineering and Management, v. 132, n. 5 (May 2006). (2006):