Hui-Ping Tserng
- A Contingency Model of Strategic Responses to the Institutional Challenges in Emerging Countries: Evidence and Findings from Least Developed Countries. In: Journal of Management in Engineering (ASCE), v. 39, n. 4 (July 2023). (2023):
- (2022): Using a Unique Retaining Method for Building Foundation Excavation: A Case Study on Sustainable Construction Methods and Circular Economy. In: Buildings, v. 12, n. 3 (8 March 2022).
- GPS-Based Real-Time Guidance Information System for Marine Pier Construction. In: Journal of Surveying Engineering (ASCE), v. 139, n. 2 (May 2013). (2013):
- Developing Bim-assisted As-built Schedule Management System for General Contractors. In: Journal of Civil Engineering and Management, v. 20, n. 1 (March 2014). (2014):
- Motion Planning for an Autonomous Compactor in a Waste Landfill Site. In: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 5 (September 1995). (1995):
- AutoPave: towards an automated paving system for asphalt pavement compaction operations. In: Automation in Construction, v. 8, n. 2 (December 1998). (1998):
- OPSALC: A computer-integrated operations planning system for autonomous landfill compaction. In: Automation in Construction, v. 5, n. 1 (March 1996). (1996):
- The Web-based real time bridge scour monitoring system for disaster management. In: The Baltic Journal of Road and Bridge Engineering, v. 9, n. 1 (March 2014). (2014):