0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Steven M. Trost

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Oberlender, Garold D. / Trost, Steven M. (2001): Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. In: Journal of Construction Engineering and Management, v. 127, n. 3 (June 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:3(173)

  2. Trost, Steven M. / Oberlender, Garold D. (2003): Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. In: Journal of Construction Engineering and Management, v. 129, n. 2 (March - April 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:2(198)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine