Steven M. Trost
- Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. In: Journal of Construction Engineering and Management, v. 127, n. 3 (June 2001). (2001):
- Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. In: Journal of Construction Engineering and Management, v. 129, n. 2 (March - April 2003). (2003):