M. Thewes
- Predictive machine learning in earth pressure balanced tunnelling for main drive torque estimation of tunnel boring machines. In: Tunnelling and Underground Space Technology, v. 146 (April 2024). (2024):
- Assessment method for clay clogging and disintegration of fines in mechanised tunnelling. In: Tunnelling and Underground Space Technology, v. 37 (August 2013). (2013):
- Recommendations of the German working group on design and calculation of shield machines. In: Tunnelling and Underground Space Technology, v. 21, n. 3-4 (May 2006). (2006):
- Suggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBM. In: Tunnelling and Underground Space Technology, v. 49 (June 2015). (2015):
- Soil conditioning with foam during EPB tunnelling / Konditionierung von Lockergesteinen bei Erddruckschilden. In: Geomechanics and Tunnelling, v. 3, n. 3 ( 2010). (2010):