John Thedy
- Semi-Markov process-driven maintenance scheduling for Tainter gate system considering multiplelimit states. In: Structural Health Monitoring. :
- Small data-based maintenance planning for a Tainter gate using component and system reliability. In: Automation in Construction, v. 167 (November 2024). (2024):
- Multisphere-based importance sampling for structural reliability. In: Structural Safety, v. 91 (July 2021). (2021):