Sek Yee Teh
- Field performance of bitumen emulsion Cold Central Plant Recycling (CCPR) mixture with same day and delayed overlay compared with traditional rehabilitation procedures. In: Case Studies in Construction Materials, v. 17 (December 2022). (2022):
- Evaluation of asphalt mixture behavior incorporating warm mix additives and reclaimed asphalt pavement. In: Journal of Traffic and Transportation Engineering (English Edition), v. 5, n. 3 (June 2018). (2018):
- Asphalt mixture workability and effects of long-term conditioning methods on moisture damage susceptibility and performance of warm mix asphalt. In: Construction and Building Materials, v. 207 (May 2019). (2019):
- Use of imaging technique and direct tensile test to evaluate moisture damage properties of warm mix asphalt using response surface method. In: Construction and Building Materials, v. 132 (February 2017). (2017):