Clyde B. Tatum
- Challenges for Integrated Design and Delivery Solutions. In: Architectural Engineering and Design Management, v. 6, n. 4 (January 2010). (2010):
- Issues in Professional Construction Management. In: Journal of Construction Engineering and Management, v. 109, n. 1 (March 1983). (1983):
- Heavy Rigging for Nuclear Projects. In: Journal of Construction Engineering and Management, v. 109, n. 1 (March 1983). (1983):
- Innovations in Nuclear Concrete Construction. In: Journal of Construction Engineering and Management, v. 109, n. 2 (June 1983). (1983):
- Resident Engineering in Power Plant Construction. In: Journal of Construction Engineering and Management, v. 109, n. 2 (June 1983). (1983):
- Organizing Large Projects: How Managers Decide. In: Journal of Construction Engineering and Management, v. 110, n. 3 (September 1984). (1984):
- What Prompts Construction Innovation?. In: Journal of Construction Engineering and Management, v. 110, n. 3 (September 1984). (1984):
- Improving Constructibility during Conceptual Planning. In: Journal of Construction Engineering and Management, v. 113, n. 2 (June 1987). (1987):
- Balancing Engineering and Management in Construction Education. In: Journal of Construction Engineering and Management, v. 113, n. 2 (June 1987). (1987):
- Considering Prework on Industrial Projects. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005). (2005):