0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Mitropoulos, Panagiotis / Tatum, C. B. (2000): Management-Driven Integration. In: Journal of Management in Engineering (ASCE), v. 16, n. 1 (January 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:1(48)

  2. Hansen, Karen Lee / Tatum, C. B. (1996): How Strategies Happen: A Decision-Making Framework. In: Journal of Management in Engineering (ASCE), v. 12, n. 1 (January 1996).

    https://doi.org/10.1061/(asce)0742-597x(1996)12:1(40)

  3. Tatum, C. B. (1990): Integration: Emerging Management Challenge. In: Journal of Management in Engineering (ASCE), v. 6, n. 1 (January 1990).

    https://doi.org/10.1061/(asce)9742-597x(1990)6:1(47)

  4. Tatum, C. B. (1989): Management Challenges of Integrating Construction Methods and Design Approaches. In: Journal of Management in Engineering (ASCE), v. 5, n. 2 (April 1989).

    https://doi.org/10.1061/(asce)9742-597x(1989)5:2(139)

  5. Tatum, C. B. (1989): Managing for Increased Design and Construction Innovation. In: Journal of Management in Engineering (ASCE), v. 5, n. 4 (January 1989).

    https://doi.org/10.1061/(asce)9742-597x(1989)5:4(385)

  6. Tatum, C. B. (1987): Business Planning for Design and Construction Firms. In: Journal of Management in Engineering (ASCE), v. 3, n. 2 (April 1987).

    https://doi.org/10.1061/(asce)9742-597x(1987)3:2(117)

  7. Howard, H. C. / Levitt, R. E. / Paulson, B. C. / Pohl, J. G. / Tatum, C. B. (1989): Computer Integration: Reducing Fragmentation in AEC Industry. In: Journal of Computing in Civil Engineering, v. 3, n. 1 (January 1989).

    https://doi.org/10.1061/(asce)0887-3801(1989)3:1(18)

  8. Korman, Thomas M. / Tatum, C. B. (2006): Prototype Tool for Mechanical, Electrical, and Plumbing Coordination. In: Journal of Computing in Civil Engineering, v. 20, n. 1 (January 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:1(38)

  9. Mitropoulos, Panagiotis / Tatum, C. B. (2000): Forces Driving Adoption of New Information Technologies. In: Journal of Construction Engineering and Management, v. 126, n. 5 (October 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:5(340)

  10. Tatum, C. B. (1986): Designing Project Organizations: An Expanded Process. In: Journal of Construction Engineering and Management, v. 112, n. 2 (June 1986).

    https://doi.org/10.1061/(asce)0733-9364(1986)112:2(259)

  11. Tatum, C. B. (1986): Potential Mechanisms for Construction Innovation. In: Journal of Construction Engineering and Management, v. 112, n. 2 (June 1986).

    https://doi.org/10.1061/(asce)0733-9364(1986)112:2(178)

  12. Tatum, C. B. / Funke, A. T. (1988): Partially Automated Grading: Construction Process Innovation. In: Journal of Construction Engineering and Management, v. 114, n. 1 (March 1988).

    https://doi.org/10.1061/(asce)0733-9364(1988)114:1(19)

  13. Tatum, C. B. (1988): Classification System for Construction Technology. In: Journal of Construction Engineering and Management, v. 114, n. 3 (March 1988).

    https://doi.org/10.1061/(asce)0733-9364(1988)114:3(344)

  14. Stewart, William S. / Tatum, C. B. (1988): Segmental Placement of Renton Outfall: Construction Innovation. In: Journal of Construction Engineering and Management, v. 114, n. 3 (March 1988).

    https://doi.org/10.1061/(asce)0733-9364(1988)114:3(390)

  15. Tatum, C. B. (1987): Process of Innovation in Construction Firm. In: Journal of Construction Engineering and Management, v. 113, n. 4 (December 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:4(648)

  16. Tatum, C. B. / Bauer, M. F. / Meade, A. W. (1989): Process of Innovation for Up/Down Construction at Rowes Wharf. In: Journal of Construction Engineering and Management, v. 115, n. 2 (June 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:2(179)

  17. Tatum, C. B. (1989): Organizing to Increase Innovation in Construction Firms. In: Journal of Construction Engineering and Management, v. 115, n. 4 (December 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:4(602)

  18. Nam, C. H. / Tatum, C. B. (1992): Noncontractual Methods of Integration on Construction Projects. In: Journal of Construction Engineering and Management, v. 118, n. 2 (June 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:2(385)

  19. Nam, C. H. / Tatum, C. B. (1992): Strategies for Technology Push: Lessons from Construction Innovations. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:3(507)

  20. Nam, C. H. / Tatum, C. B. (1992): Government‐Industry Cooperation: Fast‐Track Concrete Innovation. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:3(454)

  21. Nam, C. H. / Gasiorowski, J. G. / Tatum, C. B. (1991): Microlevel Study of Integration in High‐Strength Concrete Innovation. In: Journal of Construction Engineering and Management, v. 117, n. 2 (June 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:2(294)

  22. Mahoney, John J. / Tatum, C. B. (1994): Construction Site Applications of CAD. In: Journal of Construction Engineering and Management, v. 120, n. 3 (September 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:3(617)

  23. Fischer, Martin / Tatum, C. B. (1997): Characteristics of Design-Relevant Constructability Knowledge. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:3(253)

  24. Tatum, C. B. (2011): Core Elements of Construction Engineering Knowledge for Project and Career Success. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000306

  25. Tatum, C. B. (2005): Building Better: Technical Support for Construction. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:1(23)

  26. Korman, Thomas M. / Fischer, Martin A. / Tatum, C. B. (2003): Knowledge and Reasoning for MEP Coordination. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:6(627)

  27. Tatum, C. B. / Vorster, Michael / Klingler, Mac (2006): Innovations in Earthmoving Equipment: New Forms and Their Evolution. In: Journal of Construction Engineering and Management, v. 132, n. 9 (September 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:9(987)

  28. Nam, C. H. / Tatum, C. B. (1988): Major characteristics of constructed products and resulting limitations of construction technology. In: Construction Management and Economics, v. 6, n. 2 (June 1988).

    https://doi.org/10.1080/01446198800000012

  29. Nam, C. H. / Tatum, C. B. (1997): Leaders and champions for construction innovation. In: Construction Management and Economics, v. 15, n. 3 (May 1997).

    https://doi.org/10.1080/014461997372999

  30. Tatum, C. B. / Korman, Thomas (2000): Coordinating Building Systems: Process and Knowledge. In: Journal of Architectural Engineering (ASCE), v. 6, n. 4 (December 2000).

    https://doi.org/10.1061/(asce)1076-0431(2000)6:4(116)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine