Michael Tapley
- (2013): Challenges in Erecting the West Kowloon Terminus Roof. Presented at: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013.
- (2008): Stonecutters Bridge – Main Span Erection. Presented at: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- Staying power. In: Bridge Design & Engineering, v. 12, n. 44 (3rd Quarter 2006). (2006):