0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hiroshi Tanoue

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kiyota, Masaru / Vandebona, Upali / Tanoue, Hiroshi (1999): Multistage Optimization of Reconstruction Sequence of Highways. In: Journal of Transportation Engineering, v. 125, n. 5 (September 1999).

    https://doi.org/10.1061/(asce)0733-947x(1999)125:5(456)

  2. Takada, Hiroshi / Kiyota, Masaru / Tanoue, Hiroshi (1986): Department of Civil Engineering II, Faculty of Science and Engineeing, Saga University. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1986, n. 365 (January 1986).

    https://doi.org/10.2208/jscej.1986.24

  3. Kiyota, Masaru / Takata, Hiroshi / Chishaki, Takeshi / Tanoue, Hiroshi (1987): Finding Unsatisfactory Sections Of Road Network And Investigation Of Their Improvement Based On Residents' Complaints. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1987, n. 383 (July 1987).

    https://doi.org/10.2208/jscej.1987.383_63

  4. Kiyota, Masaru / Chisyaki, Takeshi / Koga, Shinji / Tanoue, Hiroshi (1992): A Method To Determine The Groups Of The Road Sections To Be Worked Simultaneously In An Urban District. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1992, n. 449 (July 1992).

    https://doi.org/10.2208/jscej.1992.449_227

  5. Kiyota, Masaru / Tanoue, Hiroshi / Sumi, Tomonori / Deguchi, Chikashi (1994): A Method For Determine The Groups Of The Road Sections To Be Simultaneously Constructed And The Priority Between These Groups Considering The Disutility Under Construction. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1994, n. 494 ( 1994).

    https://doi.org/10.2208/jscej.1994.494_63

  6. Kiyota, Masaru / Sumi, Tomonori / Okimoto, Hiroto / Tanoue, Hiroshi (1997): Passing Behavior Of Drivers Forced To Follow Low Speed Vehicles On A Two-lane Highway. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1997, n. 569 (July 1997).

    https://doi.org/10.2208/jscej.1997.569_43

  7. Tanoue, Hiroshi / Kiyota, Masaru / Chisyaki, Takeshi / Sumi, Tomonori (1998): A Method For Determining The Groups Of Road Segments To Be Simultaneously Constructed, The Priority Between Them And Construction Pattern Considering The Disutility Under Construction. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1998, n. 604 (October 1998).

    https://doi.org/10.2208/jscej.1998.604_1

  8. Amoussou, Rétyce I. H. D. T. / Tanoue, Hiroshi / Sasaki, Mitsuru / Shigeishi, Mitsuhiro (2016): Hydrothermal recovery of asphalt from asphalt concrete. In: Construction and Building Materials, v. 125 (October 2016).

    https://doi.org/10.1016/j.conbuildmat.2016.07.129

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine