Ch. Széchy
- Welding experiences at the construction of the newest Danube and Tisza bridges in Hungary. Presented at: Troisième Congrès de l'AIPC = Dritter Kongress der IVBH = Third Congress of IABSE, Liège, 13-18 Septembre 1948. (1948):
- The application of prestressing at composite steel plate girder bridges co-operation with the overlying reinforced concrete slab. Presented at: Troisième Congrès de l'AIPC = Dritter Kongress der IVBH = Third Congress of IABSE, Liège, 13-18 Septembre 1948. (1948):
- Tests with welded light-weight deck structures. Presented at: Fifth Congress of IABSE = Cinquième Congrès de l'AIPC = Fünfter Kongress der IVBH, Lisboa-Porto, 25 de Junho - 2 de Julho 1956. (1956):
- La reconstruction du pont-route sur la Tisza à Szeged. In: Ossature métallique, v. 14 (October 1949). (1949):
- La reconstruction du pont Marguerite à Budapest. In: Ossature métallique, v. 13 (September 1948). (1948):
- Construction du pont Arpad, sur le Danube à Budapest. In: Ossature métallique, v. 12 (October 1947). (1947):
- La reconstruction des ponts sur le Danube, à Budapest (1ère partie). In: Travaux, n. 154 (August 1947). (1947):
- La reconstruction des ponts sur le Danube, à Budapest (2ème partie). In: Travaux, n. 156 (October 1947). (1947):