- Service life prediction of prestressed anchor cable exposed to a dry-wet cycling corrosion environment. In: Construction and Building Materials, v. 406 (November 2023). (2023):
- Newly developed pressure adaptable concrete lining for high pressure hydraulic tunnels. In: Tunnelling and Underground Space Technology, v. 105 (November 2020). (2020):