R. Sturk
- Risk and decision analysis for large underground projects, as applied to the Stockholm Ring Road tunnels. In: Tunnelling and Underground Space Technology, v. 11, n. 2 (April 1996). (1996):
- Tunnel construction with a TBM in very difficult hydraulic and geological conditions and with very strict environmental demands. Presented at: AFTES - Journées techniques, Monaco, 2008. (2008):
- Advanced Ground Freezing at the Hallandsås Project, Sweden. In: Geomechanik und Tunnelbau, v. 1, n. 5 ( 2008). (2008):