- Building clustering for regional seismic response and damage analysis. In: Earthquake Spectra, v. 38, n. 4 (25 July 2022). (2022):
- A detailed damage investigation of an instrumented ductile reinforced concrete building following the M-7.8 Kaikoura earthquake. In: Earthquake Spectra, v. 40, n. 3 (April 2024). (2024):
- Regional seismic response assessment using indicator buildings. In: Bulletin of Earthquake Engineering, v. 22, n. 5 (February 2024). (2024):
- (2023): Development of Seismic Response Model for Wellington Building Inventory Using Indicator Buildings. Presented at: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- Incorporating potential environmental impacts in building seismic design decisions. In: Bulletin of Earthquake Engineering, v. 21, n. 9 (June 2023). (2023):
- Minimizing Superstructure Twist in Irregular Bridges through Optimization of Structural Parameters. In: Journal of Bridge Engineering (ASCE), v. 28, n. 7 (July 2023). (2023):
- The Estimated Carbon Cost of Concrete Building Demolitions following the Canterbury Earthquake Sequence. In: Earthquake Spectra, v. 38, n. 3 (February 2022). (2022):
- (2017): Response of instrumented buildings under the 2016 Kaikoura earthquake. In: Bulletin of the New Zealand Society for Earthquake Engineering, v. 50, n. 2 (June 2017).
- Inelastic response prediction of CFST columns and connections subjected to lateral loading. In: Journal of Constructional Steel Research, v. 132 (May 2017). (2017):
- End web stiffeners for connecting ductile replaceable links. In: Journal of Constructional Steel Research, v. 150 (November 2018). (2018):
- (2017): Comparing Seismic and Tsunami Load Demands on Reinforced Concrete and Concrete Filled Steel Tube Bridges. Presented at: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- Design of CFST column-to-foundation/cap beam connections for moderate and high seismic regions. In: Engineering Structures, v. 122 (September 2016). (2016):
- Seismic CFST Column-to-Precast Cap Beam Connections for Accelerated Bridge Construction. In: Journal of Structural Engineering (ASCE), v. 142, n. 9 (September 2016). (2016):
- Seismic performance modeling of concrete-filled steel tube bridges: Tools and case study. In: Engineering Structures, v. 165 (June 2018). (2018):
- Concrete Filled Steel Tubes for Bridge Pier and Foundation Construction. In: International Journal of Steel Structures, v. 18, n. 1 ( 2018). (2018):