Eknarin Sriprasert
- Assessment of cost control systems: a case study of Thai construction organizations. In: Engineering, Construction and Architectural Management, v. 8, n. 1 (January 2001). (2001):
- Development of an integrated information resource base for 4D/VR construction processes simulation. In: Automation in Construction, v. 12, n. 2 (March 2003). (2003):
- Construction scheduling using multiāconstraint and genetic algorithms approach. In: Construction Management and Economics, v. 24, n. 1 (January 2006). (2006):