Shahryar Sorooshian
- The Threshold for Under-Reinforced Concrete Sections Proposed by ACI 318, EC 2 and BS 8110. In: Civil Engineering and Architecture, v. 9, n. 6 (October 2021). (2021):
- 4P delays in project management. In: Engineering, Construction and Architectural Management, v. 25, n. 1 (February 2018). (2018):
- Effect of lean tools to control external environment risks of construction projects. In: Sustainable Cities and Society, v. 32 (July 2017). (2017):