-
Kim, Young Joo / Skibniewski, Miroslaw J. (2023): Protest Denied: A Qualitative Meta-Analysis of Failed Challenges to Government Contracting. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (May 2023).
https://doi.org/10.1061/jladah.ladr-925
-
Kim, Young Joo / Skibniewski, Miroslaw J. (2023): Optimism Bias in Bidding: Contractors’ Horizontally Biased Estimating Behavior. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (May 2023).
https://doi.org/10.1061/jladah.ladr-845
-
Ding, Liping / Wu, Xianguo / Zhang, Limao / Skibniewski, Miroslaw J. (2015): How to protect historical buildings against tunnel-induced damage: A case study in China. In: Journal of Cultural Heritage, v. 16, n. 6 (November 2015).
https://doi.org/10.1016/j.culher.2015.03.001
-
Zhang, Limao / Wu, Xianguo / Ding, Lieyun / Skibniewski, Miroslaw J. (2013): A novel model for risk assessment of adjacent buildings in tunneling environments. In: Building and Environment, v. 65 (July 2013).
https://doi.org/10.1016/j.buildenv.2013.04.008
-
Zhang, Limao / Liu, Qian / Wu, Xianguo / Skibniewski, Miroslaw J. (2016): Perceiving Interactions on Construction Safety Behaviors: Workers’ Perspective. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000454
-
Chen, Jieh-Haur / Hsu, Shu-Chien / Luo, Yung-Hong / Skibniewski, Miroslaw J. (2012): Knowledge Management for Risk Hedging by Construction Material Suppliers. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).
https://doi.org/10.1061/(asce)me.1943-5479.0000111
-
Golden, Sabrina K. / Skibniewski, Miroslaw J. (2010): Immigration and Construction: Analysis of the Impact of Immigration on Construction Project Costs. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010).
https://doi.org/10.1061/(asce)me.1943-5479.0000021
-
Yuan, Jingfeng / Skibniewski, Miroslaw J. / Li, Qiming / Zheng, Lei (2010): Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders. In: Journal of Management in Engineering (ASCE), v. 26, n. 2 (April 2010).
https://doi.org/10.1061/(asce)me.1943-5479.0000011
-
Ju, Qianqian / Ding, Lieyun / Skibniewski, Miroslaw J. (2017): Optimization strategies to eliminate interface conflicts in complex supply chains of construction projects. In: Journal of Civil Engineering and Management, v. 23, n. 6 (June 2017).
https://doi.org/10.3846/13923730.2016.1232305
-
Liu, Hui / Skibniewski, Miroslaw J. / Wang, Mengjun (2016): Identification and Hierarchical Structure of Critical Success Factors for Innovation in Construction Projects: Chinese Perspective. In: Journal of Civil Engineering and Management, v. 22, n. 3 (March 2016).
https://doi.org/10.3846/13923730.2014.975739
-
Abduh, Muhamad / Skibniewski, Miroslaw J. (2002): Optimal Configuration of Electronic Networking Technologies for Supporting D/B projects. In: Journal of Civil Engineering and Management, v. 8, n. 4 (December 2002).
https://doi.org/10.3846/13923730.2002.10531284
-
Zhang, Limao / Wu, Xianguo / Liu, Wenli / Skibniewski, Miroslaw J. (2019): Optimal Strategy to Mitigate Tunnel-Induced Settlement in Soft Soils: Simulation Approach. In: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 5 (October 2019).
https://doi.org/10.1061/(asce)cf.1943-5509.0001322
-
Guo, Shengyu / Ding, Lieyun / Zhang, Yongcheng / Skibniewski, Miroslaw J. / Liang, Kongzheng (2019): Hybrid Recommendation Approach for Behavior Modification in the Chinese Construction Industry. In: Journal of Construction Engineering and Management, v. 145, n. 6 (June 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001665
-
Zhou, Cheng / Ding, Lieyun / Zhou, Ying / Zhang, Hantao / Skibniewski, Miroslaw J. (2019): Hybrid Support Vector Machine Optimization Model for Prediction of Energy Consumption of Cutter Head Drives in Shield Tunneling. In: Journal of Computing in Civil Engineering, v. 33, n. 3 (May 2019).
https://doi.org/10.1061/(asce)cp.1943-5487.0000833
-
Russell, Jeffrey S. / Skibniewski, Miroslaw J. (1990): QUALIFIER‐1: Contractor Prequalification Model. In: Journal of Computing in Civil Engineering, v. 4, n. 1 (January 1990).
https://doi.org/10.1061/(asce)0887-3801(1990)4:1(77)
-
Russell, Jeffrey S. / Skibniewski, Miroslaw J. / Cozier, David R. (1990): Qualifier‐2: Knowledge‐Based System for Contractor Prequalification. In: Journal of Construction Engineering and Management, v. 116, n. 1 (March 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:1(157)
-
Murtaza, Mirza B. / Fisher, Deborah J. / Skibniewski, Miroslaw J. (1993): Knowledge‐Based Approach to Modular Construction Decision Support. In: Journal of Construction Engineering and Management, v. 119, n. 1 (March 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:1(115)
-
Chao, Li‐Chung / Skibniewski, Miroslaw J. (1995): Neural Network Method of Estimating Construction Technology Acceptability. In: Journal of Construction Engineering and Management, v. 121, n. 1 (March 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:1(130)
-
Son, Jaeho / Skibniewski, Miroslaw J. (1999): Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. In: Journal of Construction Engineering and Management, v. 125, n. 1 (January 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:1(23)
-
Chao, Li‐Chung / Skibniewski, Miroslaw J. (1998): Fuzzy Logic for Evaluating Alternative Construction Technology. In: Journal of Construction Engineering and Management, v. 124, n. 4 (July 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:4(297)
-
Skibniewski, Miroslaw J. / Tamaki, Kinya (1994): Logistics Support System for Construction Robotics Implementation. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (January 1994).
https://doi.org/10.1111/j.1467-8667.1994.tb00363.x
-
Skibniewski, Miroslaw J. / Kunigahalli, Raghavan / Russell, Jeffrey S. (1993): Managing multiple construction robots with a computer. In: Automation in Construction, v. 2, n. 3 (December 1993).
https://doi.org/10.1016/0926-5805(93)90041-u
-
Kunigahalli, Raghavan / Russel, Jeffrey S. / Skibniewski, Miroslaw J. (1994): Motion planning for automated construction. In: Automation in Construction, v. 3, n. 1 (May 1994).
https://doi.org/10.1016/0926-5805(94)90034-5
-
Yu, Wen-der / Skibniewski, Miroslaw J. (1999): A neuro-fuzzy computational approach to constructability knowledge acquisition for construction technology evaluation. In: Automation in Construction, v. 8, n. 5 (June 1999).
https://doi.org/10.1016/s0926-5805(98)00104-6
-
Yu, Wen-der / Skibniewski, Miroslaw J. (1999): Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system. In: Automation in Construction, v. 8, n. 5 (June 1999).
https://doi.org/10.1016/s0926-5805(98)00105-8
-
Yuan, Jingfeng / Zeng, Alex Yajun / Skibniewski, Miroslaw J. / Li, Qiming (2009): Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. In: Construction Management and Economics, v. 27, n. 3 (March 2009).
https://doi.org/10.1080/01446190902748705
-
Skibniewski, Miroslaw J. / Kassouf, Paul J. (1990): Potential for application of plastic liner plates in tunnelling works. In: Construction Management and Economics, v. 8, n. 1 (March 1990).
https://doi.org/10.1080/01446199000000002
-
Skibniewski, Miroslaw J. (1991): Information management system for new construction technologies. In: Construction Management and Economics, v. 9, n. 1 (February 1991).
https://doi.org/10.1080/01446199100000004
-
Lee, Yong-Seon / Jang, Won-Suk / Skibniewski, Miroslaw J. (2009): Noise Evaluation for Pavement Maintenance in Metropolitan Highway Bridges. In: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 3 (June 2009).
https://doi.org/10.1061/(asce)0887-3828(2009)23:3(181)
-
Golden, Sabrina K. / Skibniewski, Miroslaw J. (2009): Immigration and Construction: The Makeup of the Workforce in the Washington, D.C., Metropolitan Area. In: Journal of Construction Engineering and Management, v. 135, n. 9 (September 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000058