-
Khoso, Ali Raza / Yusof, Aminah Md. / Chen, Zhen-Song / Wang, Xian-Jia / Skibniewski, Mirosław J. / Memon, Nafees Ahmed (2021): Embedded Remote Group Environment Through Modification in Macbeth – an Application of Contractor’s Selection in Construction. In: Journal of Civil Engineering and Management, v. 27, n. 8 (8 November 2021).
https://doi.org/10.3846/jcem.2021.15763
-
Yuan, Jingfeng / Chan, Albert P. C. / Xia, Bo / Skibniewski, Mirosław J. / Xiong, Wei / Ji, Chuang (2016): Cumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study. In: Journal of Infrastructure Systems, v. 22, n. 2 (June 2016).
https://doi.org/10.1061/(asce)is.1943-555x.0000272
-
Zhang, Lei / Yuan, Jingfeng / Xia, Nini / Ning, Yan / Ma, Junwei / Skibniewski, Mirosław J. (2020): Measuring Value-Added-Oriented BIM Climate in Construction Projects: Dimensions and Indicators. In: Journal of Civil Engineering and Management, v. 26, n. 8 (5 November 2020).
https://doi.org/10.3846/jcem.2020.13893
-
Yuan, Jingfeng / Li, Wei / Zheng, Xiaodan / Skibniewski, Mirosław J. (2018): Improving Operation Performance of Public Rental Housing Delivery by PPPs in China. In: Journal of Management in Engineering (ASCE), v. 34, n. 4 (July 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000615
-
Zhang, Hong / Jin, Rui / Li, Heng / Skibniewski, Mirosław J. (2018): Pavement Maintenance–Focused Decision Analysis on Concession Periods of PPP Highway Projects. In: Journal of Management in Engineering (ASCE), v. 34, n. 1 (January 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000568
-
Yuan, Jingfeng / Xu, Wei / Xia, Bo / Skibniewski, Mirosław J. (2018): Exploring Key Indicators of Residual Value Risks in China’s Public–Private Partnership Projects. In: Journal of Management in Engineering (ASCE), v. 34, n. 1 (January 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000561
-
Wei, Hsi-Hsien / Liu, Muqing / Skibniewski, Mirosław J. / Balali, Vahid (2016): Prioritizing Sustainable Transport Projects through Multicriteria Group Decision Making: Case Study of Tianjin Binhai New Area, China. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000449
-
Yuan, Jingfeng / Chan, Albert P. C. / Xiong, Wei / Skibniewski, Mirosław J. / Li, Qiming (2015): Perception of Residual Value Risk in Public Private Partnership Projects: Critical Review. In: Journal of Management in Engineering (ASCE), v. 31, n. 3 (May 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000256
-
Yuan, Jingfeng / Wang, Chao / Skibniewski, Mirosław J. / Li, Qiming (2012): Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).
https://doi.org/10.1061/(asce)me.1943-5479.0000113
-
Tatari, Omer / Castro-Lacouture, Daniel / Skibniewski, Mirosław J. (2008): Performance Evaluation of Construction Enterprise Resource Planning Systems. In: Journal of Management in Engineering (ASCE), v. 24, n. 4 (October 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:4(198)
-
Xiong, Wei / Yuan, Jing-Feng / Li, Qiming / Skibniewski, Mirosław J. (2015): Performance Objective-based Dynamic Adjustment Model To Balance the Stakeholders’ Satisfaction in Ppp Projects. In: Journal of Civil Engineering and Management, v. 21, n. 5 (May 2015).
https://doi.org/10.3846/13923730.2014.895409
-
Skibniewski, Mirosław J. (2014): Information Technology Applications in Construction Safety Assurance. In: Journal of Civil Engineering and Management, v. 20, n. 6 (December 2014).
https://doi.org/10.3846/13923730.2014.987693
-
Kačianauskas, Rimantas / Kaklauskas, Arturas / Skibniewski, Mirosław J. / Kaklauskas, Gintaris / Antuchevičienė, Jurgita / Tupenaite, Laura (2014): A Life Dedicated To Science. On the Occasion of the 70th Birthday of Editor-in-chief Edmundas Kazimieras Zavadskas. In: Journal of Civil Engineering and Management, v. 20, n. 3 (June 2014).
https://doi.org/10.3846/13923730.2014.925276
-
Ren, Yali / Skibniewski, Mirosław J. / Jiang, Shaohua (2012): Building Information Modeling Integrated With Electronic Commerce Material Procurement and Supplier Performance Management System. In: Journal of Civil Engineering and Management, v. 18, n. 5 (September 2012).
https://doi.org/10.3846/13923730.2012.719835
-
Ghosh, Saumyendu / Amaya, Lenis / Skibniewski, Mirosław J. (2012): Identifying Areas of Knowledge Governance for Successful Projects. In: Journal of Civil Engineering and Management, v. 18, n. 4 (September 2012).
https://doi.org/10.3846/13923730.2012.700642
-
Yuan, Jing-Feng / Skibniewski, Mirosław J. / Li, Qiming / Shan, Jin (2010): The Driving Factors of China's Public-Private Partnership Projects in Metropolitian Transportation Systems: Public Sector's Viewpoint. In: Journal of Civil Engineering and Management, v. 16, n. 1 (March 2010).
https://doi.org/10.3846/jcem.2010.01
-
Tatari, Omer / Castro‐Lacouture, Daniel / Skibniewski, Mirosław J. (2007): Current state of construction enterprise information systems: survey research. In: Construction Innovation, v. 7, n. 4 (October 2007).
https://doi.org/10.1108/14714170710780075
-
Shohet, Igal M. / Wei, Hsi-Hsien / Skibniewski, Mirosław J. / Tak, Bhanu / Revivi, Matty (2019): Integrated Communication, Control, and Command of Construction Safety and Quality. In: Journal of Construction Engineering and Management, v. 145, n. 9 (September 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001679
-
Yu, Wen-der / Skibniewski, Mirosław J. (2010): Integrating Neurofuzzy System with Conceptual Cost Estimation to Discover Cost-Related Knowledge from Residential Construction Projects. In: Journal of Computing in Civil Engineering, v. 24, n. 1 (January 2010).
https://doi.org/10.1061/(asce)0887-3801(2010)24:1(35)
-
Castro-Lacouture, Daniel / Skibniewski, Mirosław J. (2006): Implementing a B2B e-Work System to the Approval Process of Rebar Design and Estimation. In: Journal of Computing in Civil Engineering, v. 20, n. 1 (January 2006).
https://doi.org/10.1061/(asce)0887-3801(2006)20:1(28)
-
Chung, Boo Young / Skibniewski, Mirosław J. / Lucas, Henry C. / Kwak, Young Hoon (2008): Analyzing Enterprise Resource Planning System Implementation Success Factors in the Engineering–Construction Industry. In: Journal of Computing in Civil Engineering, v. 22, n. 6 (November 2008).
https://doi.org/10.1061/(asce)0887-3801(2008)22:6(373)
-
Jang, Won-Suk / Skibniewski, Mirosław J. (2009): Embedded System for Construction Asset Tracking Combining Radio and Ultrasound Signals. In: Journal of Computing in Civil Engineering, v. 23, n. 4 (July 2009).
https://doi.org/10.1061/(asce)0887-3801(2009)23:4(221)
-
Chung, BooYoung / Skibniewski, Mirosław J. / Kwak, Young Hoon (2009): Developing ERP Systems Success Model for the Construction Industry. In: Journal of Construction Engineering and Management, v. 135, n. 3 (March 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:3(207)
-
Hiremath, Harish R. / Skibniewski, Mirosław J. (2004): Object-oriented modeling of construction processes by unified modeling language. In: Automation in Construction, v. 13, n. 4 (July 2004).
https://doi.org/10.1016/j.autcon.2003.09.011
-
Tserng, H. Ping / Yin, Samuel Y. L. / Skibniewski, Mirosław J. / Lee, M. H. (2010): Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor. In: Journal of Construction Engineering and Management, v. 136, n. 2 (February 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000125
-
Skibniewski, Mirosław J. / Ghosh, Saumyendu (2009): Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:10(965)
-
Jang, Won-Suk / Skibniewski, Mirosław J. (2009): Cost-Benefit Analysis of Embedded Sensor System for Construction Materials Tracking. In: Journal of Construction Engineering and Management, v. 135, n. 5 (May 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:5(378)
-
Salman, Ahmed F. M. / Skibniewski, Mirosław J. / Basha, Ismail (2007): BOT Viability Model for Large-Scale Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 133, n. 1 (January 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:1(50)
-
Wei, Hsi-Hsien / Shohet, Igal M. / Skibniewski, Mirosław J. / Shapira, Stav / Yao, Xijun (2016): Assessing the Lifecycle Sustainability Costs and Benefits of Seismic Mitigation Designs for Buildings. In: Journal of Architectural Engineering (ASCE), v. 22, n. 1 (March 2016).
https://doi.org/10.1061/(asce)ae.1943-5568.0000188
-
Wei, Hsi-Hsien / Skibniewski, Mirosław J. / Shohet, Igal M. / Yao, Xijun (2016): Lifecycle Environmental Performance of Natural-Hazard Mitigation for Buildings. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (June 2016).
https://doi.org/10.1061/(asce)cf.1943-5509.0000803