Jatupol Siripongvakin
- Infrastructure Project Investment Decision Timing Using a Real Options Analysis Framework with Rainbow Option. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 6, n. 3 (September 2020). (2020):