0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Su, Yang / Wang, Jun / Wang, Xiangyu / Yao, Yuan / Shou, Wenchi (2023): 3D reconstruction in underground utilities. In: Automation in Construction, v. 156 (December 2023).

    https://doi.org/10.1016/j.autcon.2023.105100

  2. Jia, Yilong / Wang, Jun / Hosseini, M. Reza / Shou, Wenchi / Wu, Peng / Chao, Mao: Temporal Graph Attention Network for Building Thermal Load Prediction. In: Energy and Buildings.

    https://doi.org/10.1016/j.enbuild.2023.113507

  3. Jia, Yilong / Wang, Jun / Shou, Wenchi / Hosseini, M. Reza / Bai, Yu (2023): Graph neural networks for construction applications. In: Automation in Construction, v. 154 (October 2023).

    https://doi.org/10.1016/j.autcon.2023.104984

  4. Su, Yang / Wang, Jun / Wang, Xiangyu / Hu, Lei / Yao, Yuan / Shou, Wenchi / Li, Danqi (2023): Zero-reference deep learning for low-light image enhancement of underground utilities 3D reconstruction. In: Automation in Construction, v. 152 (August 2023).

    https://doi.org/10.1016/j.autcon.2023.104930

  5. Chen, Gang / Huang, Jizhuo / Wang, Jun / Wei, Jiangang / Shou, Wenchi / Cao, Zhenyuan / Pan, Wenping / Zhou, Jun (2023): Optimal procurement strategy for off-site prefabricated components considering construction schedule and cost. In: Automation in Construction, v. 147 (March 2023).

    https://doi.org/10.1016/j.autcon.2022.104726

  6. Yu, Xinhua / Yu, Pengfei / Wang, Chao / Wang, Di / Shi, Weixiang / Shou, Wenchi / Wang, Jun / Wang, Xiangyu (2022): Integrating Virtual Reality and Building Information Modeling for Improving Highway Tunnel Emergency Response Training. In: Buildings, v. 12, n. 10 (20 September 2022).

    https://doi.org/10.3390/buildings12101523

  7. Tan, Yi / Chen, Penglu / Shou, Wenchi / Sadick, Abdul-Manan (2022): Digital Twin-driven approach to improving energy efficiency of indoor lighting based on computer vision and dynamic BIM. In: Energy and Buildings, v. 270 (September 2022).

    https://doi.org/10.1016/j.enbuild.2022.112271

  8. Huang, Can / Wang, Yongwei / Xu, Shuyuan / Shou, Wenchi / Peng, Chengming / Lv, Danfeng (2022): Vision-Based Methods for Relative Sag Measurement of Suspension Bridge Cables. In: Buildings, v. 12, n. 5 (24 April 2022).

    https://doi.org/10.3390/buildings12050667

  9. Kang, Ki-Yeob / Wang, Xiangyu / Wang, Jun / Xu, Shuyuan / Shou, Wenchi / Sun, Yanhui (2022): Utility of BIM-CFD Integration in the Design and Performance Analysis for Buildings and Infrastructures of Architecture, Engineering and Construction Industry. In: Buildings, v. 12, n. 5 (24 April 2022).

    https://doi.org/10.3390/buildings12050651

  10. Xu, Shuyuan / Wang, Jun / Wang, Xiangyu / Wu, Peng / Shou, Wenchi / Liu, Chao (2022): A Parameter-Driven Method for Modeling Bridge Defects through IFC. In: Journal of Computing in Civil Engineering, v. 36, n. 4 (July 2022).

    https://doi.org/10.1061/(asce)cp.1943-5487.0001026

  11. Shou, Wenchi / Wang, Jun / Wu, Peng (2021): The application of simulation in lean production research: a critical review and future directions. In: Engineering, Construction and Architectural Management, v. 28, n. 8 (July 2021).

    https://doi.org/10.1108/ecam-10-2020-0853

  12. Wang, Jun / Wang, Xiangyu / Shou, Wenchi / Xu, Bo (2014): Integrating BIM and augmented reality for interactive architectural visualisation. In: Construction Innovation, v. 14, n. 4 (September 2014).

    https://doi.org/10.1108/ci-03-2014-0019

  13. Wang, Jun / Zhang, Xuedong / Shou, Wenchi / Wang, Xiangyu / Xu, Bo / Kim, Mi Jeong / Wu, Peng (2015): A BIM-based approach for automated tower crane layout planning. In: Automation in Construction, v. 59 (November 2015).

    https://doi.org/10.1016/j.autcon.2015.05.006

  14. Wang, Jun / Wang, Xiangyu / Shou, Wenchi / Chong, Heap-Yih / Guo, Jun (2016): Building information modeling-based integration of MEP layout designs and constructability. In: Automation in Construction, v. 61 (January 2016).

    https://doi.org/10.1016/j.autcon.2015.10.003

  15. Wang, Jun / Shou, Wenchi / Wang, Xiangyu / Wu, Peng (2015): Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. In: Construction Management and Economics, v. 34, n. 12 (August 2015).

    https://doi.org/10.1080/01446193.2016.1227460

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine