Xiaobo Shi
- Improving emergency evacuation capacity for subway stations based on agent-based modelling. In: Construction Innovation. :
- Evaluation of risk factors affecting the safety of coal mine construction projects using an integrated DEMATEL-ISM approach. In: Engineering, Construction and Architectural Management. :
- (2022): Influencing Factors of Human Errors in Metro Construction Based on Structural Equation Modeling (SEM). In: Buildings, v. 12, n. 10 (20 September 2022).
- (2022): Safety Risk Management of Prefabricated Building Construction Based on Ontology Technology in the BIM Environment. In: Buildings, v. 12, n. 6 (7 June 2022).
- (2022): Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path. In: Civil Engineering Journal, v. 8, n. 1 (1 January 2022).