T. L. Shaw
- Study of Tital Power Projects in the UK, with the exception of the Severn Barrage. In: La Houille Blanche, v. 83, n. 3 (April 1997). (1997):
- Energy generation from a Severn Barrage prior to full commissioning. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 160, n. 1 (March 2007). (2007):
- Hydroelectric power without water storage. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 159, n. 4 (December 2006). (2006):
- Severn Barrage, UK—environmental reappraisal. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 158, n. 1 (March 2005). (2005):
- Environmental implications of upland run-of-river hydro schemes. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 156, n. 4 (December 2003). (2003):
- Flexible power generation from the tides. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 156, n. 2 (June 2003). (2003):
- The effects of pumping on the energy potential of a tidal power barrage. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 156, n. 2 (June 2003). (2003):
- Harnessing Sea Wave Energy by a Submerged Cylinder Device. In: Proceedings of the Institution of Civil Engineers, v. 73, n. 3 (September 1982). (1982):