J. W. Seo
- Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea. In: Journal of Construction Engineering and Management, v. 134, n. 1 (January 2008). (2008):
- Risk Assessment Methodology for Underground Construction Projects. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004). (2004):
- Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot. In: Automation in Construction, v. 16, n. 1 (January 2007). (2007):
- Control system and postprocessing in erection of composite cable-stayed bridge. Presented at: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. (1994):
- Control system and postprocessing in erection of composite cable-stayed bridge. Presented at: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. (1994):